New back-lit panels placed on the Sant Jordi bridge
New back-lit methacrylate panels are being placed on the Sant Jordi bridge as a barrier between pedestrians and traffic.
So far the seven of the 180 25x25x50 cm panels have been put in place on the left sidewalk of the road leading towards the Plaza de España.
All construction work is being carried out at night after the buses stop running at 10:30 pm. From that time on the bridge will be closed until bus service resumes again in the morning.